P6 Schedule Analyticsby PlanAssure
Live demo

The real product, on a fictional programme.

Every tab is open. Every figure was computed by the engine from a programme we built for the purpose; no client data, no mock-ups.

Programme
Northfield–Ashby 132 kV OHL reconductoring (fictional)
Size
428 activities, 725 relationships, 3 sections, 71 towers
Updates loaded
Rev 0 (6 Jan 2026), Rev 3 (31 Mar 2026), Rev 6 (30 Jun 2026)
Where it stands
Forecasting 15 Jan 2027 against a Completion Date of 18 Dec 2026

Start with Schedule Health, then open the Gantt and click an activity to trace its logic.

Open full screen

On a phone the demo is easier to use in its own tab.

What you can do

Open every tab, drill into every check, filter the Gantt, trace logic, read the risk results and download the full Excel workbook.

What needs an account

Uploading your own programme, changing thresholds or the date window, re-running the simulation and writing a repaired XER. The demo replays recorded results, so it can't recalculate, and it says so when you ask.